image ochshornDesign.com
Architectural practice
Jonathan Ochshorn
Jonathan Ochshorn Architect: phone 607 277-7791 (607 255-1194 Cornell office)
207 Water Street, Ithaca, NY 14850

contact | rock'n'roll homepage | academic homepage | ochshornDesign homepage
 

Driveway construction (Design-build), Ithaca, NY:
Crusher run gravel.

Construction process: <-- previous | 1 | 2 | 3 | 4 | 5
 
ochshorn driveway crusher run gravel
Finally, the crusher run gravel arrives: here are the first 20 tons of the 60 tons that will be delivered in three truck loads (about 36 cubic yards altogether).
  ochshorn driveway crusher run gravel
Dale Everhart returns with his small backhoe to spread the gravel over the driveway (the dump truck is too big to maneuver very far into the driveway, so the services of a small backhoe are required).

ochshorn driveway crusher run with roller
We rent a walk-behind vibrating gas-powered roller to compress the crusher run; Susan does most of the work...
  ochshorn driveway crusher run with roller
...but I also have fun with the heavy machinery.

ochshorn driveway finished
The driveway is complete. We re-seed the lawn areas damaged by the gravel delivery, and place some rocks around the drainage pipe discharge area. Flexible reflectors are reluctantly placed in the pressure-treated curb to keep visiting vehicles off the curb and, especially, off the shallow sewer pipe.

Construction process: <-- previous | 1 | 2 | 3 | 4 | 5

Related links:
addition
Design-build addition to house
  renovation
Design-build renovation of original house
  rain harvesting
Rainwater harvesting

first posted: 19 July 2007 | last updated: 22 July 2007

Copyright 2007 J. Ochshorn. All rights reserved. Republishing material on this web site, whether in print or on another web site, in whole or in part, is not permitted without advance permission of the author.